MITIGATION SITE MAP FUEL REDUCTION / DEFENSIBLE SPACE STONE ELK LAND SERVICES WILDFIRE COST SHARE APPLICATION PLANNING GUIDE DOUGLAS COUNTY / 2026 PROJECT LOCATION & SCOPE PREPARATION CHECKLIST WUI PROPERTY & FUEL HAZARDS TWO DETAILED CONTRACTOR BIDS SITE MAP & MITIGATION PLAN AWARD AGREEMENT BEFORE WORK 2026 APPLICATION ROUND CLOSED ILLUSTRATION / NOT A COUNTY FORM 2026 50% MATCH ROUND CLOSED

HOME/SERVICES/LANDOWNER ASSISTANCE

DOUGLAS COUNTY, COLORADO • 2026 COST-SHARE GUIDE

Douglas County
Reimbursement Program.

Planning wildfire mitigation on your Douglas County property? Understand the county’s cost-share funding, eligibility, contractor-bid requirements, payment process, and how to prepare a well-defined defensible-space project.

2026 application rounds closed • 50% match • Up to $25,000 for individual projects • County approval required

Illustrative 2026 program guide • not an official county form

50%County match for eligible, approved project costs
$25,0002026 individual-property award cap
2 bidsMinimum detailed contractor estimates required
Closed2026 application rounds; watch for future funding

LOCAL HELP FOR WILDFIRE-RESILIENT PROPERTIES

Reduce the fuels.
Understand the cost share.

Douglas County’s Wildfire Mitigation Cost-Share Program supports qualifying homeowners, HOAs, and communities planning to reduce wildfire hazards on private land within the county’s wildland-urban interface (WUI).

Unlike a beetle-only assistance program, this cost share can support county-approved defensible space, hazardous vegetation thinning, ladder-fuel reduction, fuel breaks, and community chipping. The proposed work must match recognized wildfire mitigation practices and be accepted by county staff.

Stone Elk Land Services can discuss site conditions, develop a practical forestry or defensible-space scope, and prepare a detailed contractor estimate for homeowners comparing options. The county alone decides whether a project qualifies, which contractor may be used, and whether funds are awarded.

CURRENT PROGRAM STATUS • OCTOBER 28, 2026

2026 applications are closed. You can still plan ahead.

Douglas County reports that its 2026 application period is closed. The announced rounds were April 13–May 13 and July 27–August 27, 2026. No later application opening has been confirmed on the official program page as of this guide’s review date. Work completed before a future signed award agreement cannot receive retroactive funding under the county’s stated rules.

Check Douglas County’s live funding status

START WITH THE RIGHT QUESTIONS

Six things to know before applying.

These describe the county’s 2026 rules. Requirements may change if Douglas County announces another funding round.

01 / PROPERTY

Douglas County WUI property

The proposed mitigation site must be in Douglas County’s wildland-urban interface and owned by the applicant. County staff determine whether the property has an eligible wildfire hazard.

02 / WILDFIRE RISK

Genuine hazardous fuels

Proposals should reduce excessive vegetation density, ladder fuels, or fuel continuity and establish or improve defensible space. A cosmetic tree-removal project is not automatically eligible.

03 / PROJECT PLAN

Detailed map and work scope

Provide a site map identifying the proposed work area and a contractor narrative explaining the mitigation methods, expected results, and total cost.

04 / BIDS

At least two contractor bids

Complete applications need at least two detailed bids. Douglas County encourages its preferred contractor list, but the county says residents may choose any qualified contractor.

05 / COUNTY APPROVAL

Signed award agreement first

Project work must wait for county award notification and a signed award agreement. Unapproved or previously completed work is not retroactively funded.

06 / SELECTION

Competitive selection

The county considers the existing hazard, risk reduction, geographic location, prior mitigation efforts, and the number of people who benefit. Awards are not guaranteed.

Different from Jefferson County’s pine-beetle pilot: Douglas County did not publish a 40-acre minimum for its 2026 wildfire cost-share. The property, wildfire hazard, scope, and county approval determine suitability.

HOMEOWNER PLANNING CHECKLIST

Is your property ready for a future funding round?

Check what you already have. This is only a private planning tool, not a live county application or an eligibility approval.





Your selections remain on this page. They are not collected or sent to Stone Elk or the County.

Plan My Property Project

KNOW WHAT THE PROGRAM SUPPORTS

Fund wildfire risk reduction — not just tree removal.

Douglas County evaluates the proposal’s hazard reduction and accepted mitigation practices. Every project remains subject to county review and an award.

EXAMPLES OF POTENTIALLY ELIGIBLE WORK

Reduce fuels and create defensible space

  • Creating or improving defensible space around existing homes
  • Removing ladder fuels and reducing hazardous vegetation density
  • Thinning ponderosa pine, Gambel oak, or other vegetation where it reduces wildfire hazard
  • Community fuel breaks and linked mitigation on adjacent properties
  • Eligible fuels work on community property next to homes
  • HOA/community chipping or slash pickup proposals that meet county criteria
NOT AUTOMATICALLY ELIGIBLE

Costs or projects the county excludes

  • Developer-required mitigation tied to land-use approval
  • Homeowner labor or other in-kind contributions as the 50% match
  • Equipment rental counted toward the required match
  • Work begun before award notification and signed agreement
  • Incomplete applications, including missing second bid or site map
  • Tree work without a county-recognized wildfire hazard or approved plan

A beetle-damaged tree may still be addressed through an approved wildfire-fuel-reduction project, but beetle damage alone does not guarantee cost-share eligibility.

SEE HOW A COUNTY COST SHARE COULD WORK

Illustrative 50% funding examples.

For individual projects in the 2026 program, Douglas County offered up to half of approved costs, capped at $25,000. These are sample calculations — not bids, awards, or cash reimbursements to homeowners.

EXAMPLE 01 / SMALLER PROJECT$10,000Illustrative total of county-approved eligible work

COUNTY TO CONTRACTOR$5,000

Homeowner share: $5,000

EXAMPLE 02 / MID-SIZED PROJECT$30,000Illustrative total of county-approved eligible work

COUNTY TO CONTRACTOR$15,000

Homeowner share: $15,000

EXAMPLE 03 / CAP APPLIES$60,000Half would be $30,000, but the county award cap is $25,000

COUNTY TO CONTRACTOR$25,000 maximum

Homeowner share: $35,000

Assumes the entire project is eligible and the county approves the illustrated award. Actual funding can be lower or zero, and homeowners remain responsible for costs not funded. For 2026, community projects had a $50,000 cap; community chipping/slash pickup had a $7,500 county-contribution cap.

FROM INITIAL ASSESSMENT TO COMPLETED PROJECT

Your six-step Douglas County application roadmap.

Prepare the first three items now. Submit an application only when Douglas County announces an open funding round.

1

Check your property

Confirm ownership, Douglas County location, WUI status, and hazardous fuel conditions. Define a realistic risk-reduction goal.

2

Build a detailed scope & map

Identify the treatment area, proposed thinning or fuels work, access points, and expected improvements. Prepare a clear map graphic.

3

Collect two contractor bids

Request detailed scopes, costs, contact information, and required paperwork such as a contractor W-9. The county prefers, but does not mandate, its listed contractors.

5

Wait for written award

County staff competitively review projects and may coordinate a site visit. Sign and return the award agreement before beginning funded work.

6

Finish, inspect & split payment

Complete the approved project within the award’s timeline (2026 rules allowed 10 months). After inspection, pay your share and submit proof; the county pays the contractor its match.

2026 APPLICATION TIMELINE & WHAT COMES NEXT

Know the dates. Prepare for the next opening.

These are historical 2026 windows, not future application deadlines. Check Douglas County’s official page regularly for any new funding announcement.

SPRING 2026Apr 13 – May 13First 2026 application period (closed).
SUMMER 2026Jul 27 – Aug 27Second 2026 application period (closed).
AFTER APPROVAL10 months2026 guidelines allowed this time to complete an awarded project.
NEXT ROUNDNot announcedNew application dates, funding levels and rules must be verified.

Last verified October 28, 2026. Do not assume the 2026 award caps or requirements will apply unchanged to a future round.

A SEPARATE STATEWIDE TAX BENEFIT

Colorado’s wildfire mitigation tax credit is different from the county match.

Colorado has a tax credit for qualifying out-of-pocket costs paid to a third-party contractor for eligible wildfire mitigation work. It is a state income tax credit, not a second county reimbursement.

Never count the county-funded portion twice. Grant-paid or otherwise reimbursed expenses are not eligible for the credit. Your personally paid share may qualify only if it independently meets the ownership, income, work-type, and documentation rules for the tax year.

Read Colorado Department of Revenue guidance

2026 TAX YEAR$1,000

Maximum credit; nonrefundable, limited by Colorado income tax liability. A federal taxable-income eligibility limit also applies.

2027 TAX YEAR$2,000

Maximum under signed HB26-1289; refundable, with a $300,000 federal AGI limit. Eligibility also expands for qualifying mountain pine or spruce beetle vegetation thinning.

2027 changes are reflected in Colorado’s signed 2026 legislation and Office of the State Auditor analysis; the Department of Revenue’s detailed tax-topic webpage may still show prior-year amounts. Tax situations vary: consult a qualified tax professional. HB26-1289 • 2026 State Auditor report.

MAP YOUR PROJECT. PLAN YOUR WORK.

A better mitigation proposal begins with
a clearer scope.

A well-defined Douglas County project should tell the story of the wildfire hazard and the work proposed to reduce it. Stone Elk Land Services can discuss property conditions, practical tree and brush treatments, contractor scope details, and potential before-and-after documentation.

Optional drone imagery and LiDAR can help describe vegetation structure, terrain and project areas when included in the agreed scope; those tools do not certify a county award, prove risk reduction on their own, or guarantee approval.

Request a Mitigation Estimate

COLORADO FRONT RANGE WILDFIRE MITIGATION

Helping Douglas County owners plan practical projects.

Stone Elk Land Services works with Colorado foothill homeowners and property managers on defensible space, brush clearing, forestry thinning, and land management. Douglas County projects may include properties near the following communities, depending on access and scheduling.

RoxboroughSedaliaCastle PinesCastle RockLarkspurFranktownParkerDouglas County

The funding program applies only to eligible Douglas County projects in the WUI. A mailing address or town name does not by itself establish grant eligibility.

COMMON HOMEOWNER & HOA QUESTIONS

Douglas County cost-share FAQs.

Based on the county’s posted 2026 rules. Always verify current program requirements and funding availability before committing to work.

Is the Douglas County wildfire mitigation reimbursement program accepting applications?

No. As of October 28, 2026, Douglas County’s official website says its 2026 application period is closed. The two announced windows ended May 13 and August 27. Check the county program page for future rounds.

Who can qualify for a Douglas County wildfire mitigation cost share?

Applicants must own the property being treated; the site must be within Douglas County’s wildland-urban interface and contain wildfire hazards identified by county mitigation staff. The mitigation proposal must follow accepted best practices. Meeting the criteria does not guarantee funding.

Is there a 40-acre minimum like Jefferson County’s beetle program?

Douglas County’s 2026 wildfire mitigation cost-share information does not establish a 40-acre minimum. It uses a different eligibility approach focused on county location, WUI status, hazardous fuels, approved methods and competitive selection.

How much could a homeowner or HOA receive?

For the 2026 rounds, the county offered a 50% match with an individual-project cap of $25,000, community-project cap of $50,000, and community chipping/slash pickup contribution cap of $7,500. All amounts were subject to review, eligibility, and available program funds; future caps may change.

Does Douglas County reimburse me after I pay the entire invoice?

No. Under the county’s stated process, once an approved project passes final inspection, the homeowner pays the contractor their approved share and supplies the final invoice and proof. The County pays its approved match directly to the contractor. Do not pay the contractor in full expecting a reimbursement check from the County.

Are two contractor bids really required?

Yes. The county requires at least two detailed contractor bids, a mapped project area, and a scope/narrative. The county encourages using its preferred contractor list but says qualified contractors outside that list can be chosen. A Stone Elk estimate can be one of the bids, subject to the county’s review.

Can I start thinning or removing trees now and seek the county match later?

No retroactive grant funding is available under the county’s stated rules. To receive the match, wait until an application is approved and the award agreement is signed before beginning the funded scope. You may still consider non-grant forestry work separately, understanding that it will not qualify retroactively.

Does mountain pine beetle removal or dead-tree cleanup automatically qualify?

No. Douglas County’s program targets wildfire hazard reduction, not insect treatment alone. Some beetle-damaged or dead trees may be part of an approved defensible-space or fuel-reduction project, but county staff must agree that the work meets the program’s requirements.

How does the county choose which projects receive funding?

Selection is competitive. Douglas County considers hazard severity and proposed reduction, location, past homeowner or community mitigation efforts, and how many people benefit. No reliable application-to-award success percentage is published on the program page.

Can I also use Colorado’s $1,000 wildfire mitigation tax credit?

Possibly. For 2026, a state credit of up to $1,000 may apply to separately qualifying, paid, unreimbursed third-party mitigation costs, subject to income and tax liability limits. County-paid expenses do not qualify for that credit. For 2027, the signed state law raises the maximum to $2,000 refundable with other eligibility changes. Consult your tax professional.

REQUEST A DOUGLAS COUNTY MITIGATION PROJECT REVIEW

Ready to plan the right work for your property?

Tell us where your property is, what fuels or forest conditions concern you, and what you’re hoping to accomplish. We can discuss a realistic scope for defensible space, hazardous vegetation thinning, and future funding preparation.

Helpful details to share

Property address, approximate acreage, photos of vegetation near structures, HOA participation (if any), and whether you have an existing mitigation plan or site map.

START WITH A PROPERTY CONVERSATION

Get a Scope & Estimate

Call or email Stone Elk directly. This is a contractor inquiry, not a Douglas County funding application.

OPTION 01 / EMAILSend property photos and goals

Tell us the property location and your main wildfire mitigation concerns.

Email Stone Elk

OPTION 02 / PHONE303-475-4409

Discuss the property, scheduling, and scope of a potential estimate.

Call Stone Elk

Stone Elk is an independent contractor, not Douglas County government. Estimates do not ensure placement on the county’s preferred contractor list, approval, or financial assistance.